{ "culture": "en-US", "name": "", "guid": "", "catalogPath": "", "snippet": "On this layer, information such as project number, project manager, construction dates, and funding source are being tracked for In-Progress and Completed Private Development Projects. Private development projects have private funding. The private developer has its own contract, contractor, plans, etc. Engineering staff does inspections, easements, etc., but don\u2019t do the physical building of the project.", "description": "

Engineering Construction Data Dictionary<\/SPAN><\/SPAN><\/P><\/TD>

<\/TD><\/TR>

Attribute Title<\/SPAN><\/SPAN><\/P><\/TD>

Description<\/SPAN><\/SPAN><\/P><\/TD>

Example<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Project_Number<\/SPAN><\/SPAN><\/P><\/TD>

Engineering project number <- Means project has started design<\/SPAN><\/SPAN><\/P><\/TD>

447-22090<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

GPF_Number<\/SPAN><\/SPAN><\/P><\/TD>

State Road Identification Number. Located on As-Builts<\/SPAN><\/SPAN><\/P><\/TD>

GPF 5680<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Project_Name<\/SPAN><\/SPAN><\/P><\/TD>

Official name of the project. From project initiation form<\/SPAN><\/SPAN><\/P><\/TD>

Sanitary Sewer and Water Main in PUBLIC EASEMENT (NW) and Improvements in MAYNARD AVENUE (HOM Flats at Maynard)<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Project_Type<\/SPAN><\/SPAN><\/P><\/TD>

Type of project being executed<\/SPAN><\/SPAN><\/P><\/TD>

Private Development<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Project_Manager<\/SPAN><\/SPAN><\/P><\/TD>

Engineering staff assigned to oversee the project. From project initiation form<\/SPAN><\/SPAN><\/P><\/TD>

Jack Stegehuis<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Project_Status<\/SPAN><\/SPAN><\/P><\/TD>

Status of project<\/SPAN><\/SPAN><\/P><\/TD>

Construction<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Design_Start<\/SPAN><\/SPAN><\/P><\/TD>

Date engineering started design work. From Design Award letter or Project Detail Report for City designed projects<\/SPAN><\/SPAN><\/P><\/TD>

8/14/2022<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Estimated_Cons_Start<\/SPAN><\/SPAN><\/P><\/TD>

Date project construction is anticipated to start. From Notice to proceed<\/SPAN><\/SPAN><\/P><\/TD>

5/15/2023<\/SPAN><\/SPAN><\/P>

<\/TD><\/TR>

Cons_Start<\/SPAN><\/SPAN><\/P><\/TD>

Date project construction officially starts<\/SPAN><\/SPAN><\/P><\/TD>

7/26/2023<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Cons_End<\/SPAN><\/SPAN><\/P><\/TD>

Date project construction officially ends<\/SPAN><\/SPAN><\/P><\/TD>

8/15/2023<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Closeout_Date<\/SPAN><\/SPAN><\/P><\/TD>

Date project is closed in our system. From \u201cAdministration\u201d tab in MS Projects.<\/SPAN><\/SPAN><\/P><\/TD>

11/11/2024<\/SPAN><\/SPAN><\/P>

<\/TD><\/TR>

Fiscal_Year<\/SPAN><\/SPAN><\/P><\/TD>

Fiscal year that the capital project will be funded in. From Agenda item<\/SPAN><\/SPAN><\/P><\/TD>

2023<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Eng_Estimate<\/SPAN><\/SPAN><\/P><\/TD>

Estimated cost generated at design phase. From Engineer\u2019s Estimate at the \u201cBid Documents\u201d folder<\/SPAN><\/SPAN><\/P><\/TD>

$1,489,040.96<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Actual_Cost<\/SPAN><\/SPAN><\/P><\/TD>

Actual cost of the projects after closeout. From \u201cAdministration\u201d tab in MS Projects.<\/SPAN><\/SPAN><\/P><\/TD>

$1,989,040.96<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Funding_Source<\/SPAN><\/SPAN><\/P><\/TD>

City funding codes. From Agenda item<\/SPAN><\/SPAN><\/P><\/TD>

Private Funding<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Construction PM<\/SPAN><\/SPAN><\/P><\/TD>

Engineering staff assigned to oversee the project during the construction phase. <\/SPAN><\/SPAN><\/P><\/TD>

Jack Stegehuis<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

City_Inspector<\/SPAN><\/SPAN><\/P><\/TD>

<\/TD>

Dan Nederhoed<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Contractor<\/SPAN><\/SPAN><\/P><\/TD>

Approved contractor to perform the work<\/SPAN><\/SPAN><\/P><\/TD>

Wyoming Excavators<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Consultant<\/SPAN><\/SPAN><\/P><\/TD>

Approved consultant for professional services<\/SPAN><\/SPAN><\/P><\/TD>

Moore & Bruggink<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Project_Location<\/SPAN><\/SPAN><\/P><\/TD>

Location where the work is performed<\/SPAN><\/SPAN><\/P><\/TD>

2144 EASTCASTLE DR SE<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

Website_URL<\/SPAN><\/SPAN><\/P><\/TD>

Address of project on the Web<\/SPAN><\/SPAN><\/P><\/TD>

<\/TD><\/TR>

Notes<\/SPAN><\/SPAN><\/P><\/TD>

Space for other relevant project information<\/SPAN><\/SPAN><\/P><\/TD>

Blackhawk Site Condominium - Phase 1<\/SPAN><\/SPAN><\/P><\/TD><\/TR>

SHAPE.STLenght()<\/SPAN><\/SPAN><\/P><\/TD>

System Generated<\/SPAN><\/SPAN><\/P><\/TD>

<\/TD><\/TR><\/TBODY><\/TABLE>

<\/P><\/DIV><\/DIV><\/DIV>", "summary": "On this layer, information such as project number, project manager, construction dates, and funding source are being tracked for In-Progress and Completed Private Development Projects. Private development projects have private funding. The private developer has its own contract, contractor, plans, etc. Engineering staff does inspections, easements, etc., but don\u2019t do the physical building of the project.", "title": "ArcGIS.GDBO.ENG_PrivateDevelopmentProjects", "tags": [ "Grand Rapids", "Engineering", "Road Construction", "Streets" ], "type": "", "typeKeywords": [], "thumbnail": "", "url": "", "minScale": 150000000, "maxScale": 5000, "spatialReference": "", "accessInformation": "City of Grand Rapids - Engineering Department", "licenseInfo": "

CITY OF GRAND RAPIDS GIS ACCESS AND USE CONSTRAINTS <\/SPAN><\/SPAN><\/P>

The City of Grand Rapids provides the data for use \"as is.\" The areas depicted by this special database are approximate and are not accurate to surveying or engineering standards. The special data shown here are for illustration purposes only and are not suitable for site-specific decision making. Information found here should not be used for making financial or any other commitments. The City of Grand Rapids provides this information with the understanding that it is not guaranteed to be accurate, correct or complete and conclusions drawn from such information are the responsibility of the user. While every effort has been made to ensure the accuracy, correctness and timeliness of materials presented, the City of Grand Rapids assumes no responsibility for errors or omissions, even if The City of Grand Rapids is advised of the possibility of such damage.<\/SPAN><\/SPAN><\/P>

<\/P><\/DIV><\/DIV><\/DIV>" }